Agee Woodworks Inc.
Free Shipping | Call toll-free 877-768-3678 M-F 8:30-5:00 EST Call us toll-free 1-877-768-3678 HACKER SAFE certified sites prevent over 99.9% of hacker crime.
Why Agee?   |   Contact Agee   |   Customer Service   |   Shopping Cart Shopping Cart
Agee Woodworks Inc.Value Mantels (Mantles)Mantel ShelvesGas FireplacesFireplace CabinetsGranite, Marble and Slate Facing KitsContractorsClearance Items

Simple Mantel Shelf Assembly and Installation Instructions

Below are our mantel shelf installation instructions.

  1. Remove the nailer board from inside the back of the shelf.
  2. On the wall where you are attaching the shelf, locate the studs behind the sheetrock.
  3. Screw or nail the nailer board to the studs, making sure the board is level. If applying the mantel shelf to brick, masonry nails or liquid nail can be used.
  4. Slide the shelf over the board and at a 45 degree angle, drill pilot holes through the shelf into the nailer board….two holes should be enough.
  5. Using a finishing nail, attach shelf to the nailer board.

Please note:

  • If you do not wish to use nails, liquid nail can be used as well.
  • For additional hold, use wood glue between nailer board and wall and between nailer board and shelf.

If you are installing a mantel shelf you purchased from Agee Woodworks and you have questions, please call 804-798-3678.

 

©2013 Agee Woodworks   |   1-877-768-3678